Spain: electricity for AI data centers

In 2025, Spain generated 287.9 TWh of electricity and used 275.1 TWh. Solar was the largest source at 22% of generation.

154gCO₂/kWh grid intensity#14 of 30 · EU 210
75%low-carbon electricityEU 71%
0.105€/kWh industrial, 2026 H1#7 cheapest · EU 0.135
80€m/yr power for 100 MW AI campus135 kt CO₂/yr
Grid access outlook (editorial)More room
Solar & land, permits the bottleneck

75% of its electricity came from low-carbon sources (nuclear and renewables), above the EU-27 average of 71%. Grid carbon intensity was 154 gCO₂/kWh, ranking #14 of 30 European countries (1 = cleanest), down 53% since 2015. Industrial users consuming 20–70 GWh a year paid €0.105/kWh excluding VAT in 2026 H1, less than the EU-27 average of €0.135 (#7 cheapest of 28). At €0.092/kWh, a 100 MW AI data center running at full load (876 GWh a year) would pay about €80 million a year for electricity and, on the average grid mix, be responsible for about 135 kt of CO₂.

Electricity generation mix, 2025

Nuclear: 18.8%Hydro: 11.4%Wind: 20.4%Solar: 21.8%Bio & other renewables: 2.2%Gas: 21.6%Coal: 0.3%Oil: 3.5%
SourceSpainEU-27
Nuclear18.8%23.3%
Hydro11.4%11.7%
Wind20.4%17.1%
Solar21.8%13.1%
Bio & other renewables2.2%5.8%
Gas21.6%16.7%
Coal0.3%9.2%
Oil3.5%3.1%

Grid carbon intensity, 2005–2025

gCO₂ per kWh of electricity generated. Lower is cleaner.

0200400600200520082011201420172020202320252005: 475 g2006: 433 g2007: 439 g2008: 390 g2009: 355 g2010: 288 g2011: 337 g2012: 351 g2013: 287 g2014: 289 g2015: 328 g2016: 283 g2017: 329 g2018: 291 g2019: 247 g2020: 199 g2021: 194 g2022: 217 g2023: 170 g2024: 146 g2025: 154 g154 g

Wind and solar share of generation

02040200520082011201420172020202320252005: 7%2006: 8%2007: 9%2008: 11%2009: 15%2010: 17%2011: 18%2012: 21%2013: 24%2014: 24%2015: 23%2016: 23%2017: 23%2018: 23%2019: 26%2020: 30%2021: 33%2022: 34%2023: 40%2024: 43%2025: 42%42%

Industrial electricity price, 2019–2026 H1

Non-household consumers using 20–70 GWh/yr, excluding VAT and recoverable taxes, €/kWh.

0.000.100.202019 H12020 H12021 H12022 H12023 H12024 H12025 H12026 H12019 H1: 0.0862019 H2: 0.0812020 H1: 0.0702020 H2: 0.0732021 H1: 0.0782021 H2: 0.1342022 H1: 0.1992022 H2: 0.2252023 H1: 0.1312023 H2: 0.1172024 H1: 0.1002024 H2: 0.1142025 H1: 0.1112025 H2: 0.1082026 H1: 0.1050.105

Infrastructure & market

72colocation facilities (PeeringDB)
59data centers mapped in OpenStreetMap
–HV substations (pending)
9,200MW cross-border capacity, 2030 grid (TYNDP)
–wholesale price (no single zone)
–negative-price hours
329cooling degree days (5-yr avg)
1,360kWh/kWp solar yield at the capital (PVGIS)

Spain has 72 colocation facilities listed in PeeringDB, and hosts 2 EuroHPC AI Factories (BSC AI Factory, 1HealthAI). The TYNDP 2030 starting grid gives it about 9,200 MW of cross-border transmission capacity. Its climate averaged 329 cooling degree days a year (Eurostat), a rough guide to how hard data center cooling has to work.

See Spain on the infrastructure map →

Power plant capacity by fuel

MW, plants in the WRI Global Power Plant Database (v1.3, data around 2021). Shows the long-standing fleet, not the latest additions.

NuclearNuclear: 7,120 MW7,120 MWHydroHydro: 15,659 MW15,659 MWWindWind: 11,337 MW11,337 MWSolarSolar: 4,901 MW4,901 MWBio & wasteBio & waste: 408 MW408 MWGasGas: 26,159 MW26,159 MWCoalCoal: 8,783 MW8,783 MWOilOil: 4,667 MW4,667 MW

EuroHPC AI Factories

AI campuses announced

Grid & market notes

  • High solar resource and growing renewable capacity.
  • Madrid is the main colocation market; Aragón hosts large hyperscaler projects.
  • Grid access permits are a key constraint as requests have grown quickly.

Official grid operator & sources: Red Eléctrica · ENTSO-E · ENTSO-E Transparency Platform

Sources: Our World in Data energy dataset (Ember, Energy Institute), 2025; Eurostat nrg_pc_205, non-household prices excl. VAT, 2026 H1.