In 2025, Portugal generated 51.1 TWh of electricity and used 60.4 TWh. Hydro was the largest source at 30% of generation.
128gCO₂/kWh grid intensity#10 of 30 · EU 210
81%low-carbon electricityEU 71%
0.090€/kWh industrial, 2026 H1#2 cheapest · EU 0.135
69€m/yr power for 100 MW AI campus112 kt CO₂/yr
81% of its electricity came from low-carbon sources (nuclear and renewables), above the EU-27 average of 71%. Grid carbon intensity was 128 gCO₂/kWh, ranking #10 of 30 European countries (1 = cleanest), down 69% since 2015. Industrial users consuming 20–70 GWh a year paid €0.090/kWhexcluding VAT in 2026 H1, less than the EU-27 average of €0.135 (#2 cheapest of 28). At €0.079/kWh, a 100 MWAI data center running at full load (876 GWh a year) would pay about €69 million a year for electricity and, on the average grid mix, be responsible for about 112 kt of CO₂.
Electricity generation mix, 2025
Source
Portugal
EU-27
Nuclear
0.0%
23.3%
Hydro
29.7%
11.7%
Wind
26.7%
17.1%
Solar
17.3%
13.1%
Bio & other renewables
7.2%
5.8%
Gas
16.4%
16.7%
Coal
0.0%
9.2%
Oil
2.6%
3.1%
Grid carbon intensity, 2005–2025
gCO₂ per kWh of electricity generated. Lower is cleaner.
Wind and solar share of generation
Industrial electricity price, 2019–2026 H1
Non-household consumers using 20–70 GWh/yr, excluding VAT and recoverable taxes, €/kWh.
Infrastructure & market
14colocation facilities (PeeringDB)
19data centers mapped in OpenStreetMap
–HV substations (pending)
4,200MW cross-border capacity, 2030 grid (TYNDP)
–wholesale price (no single zone)
–negative-price hours
231cooling degree days (5-yr avg)
1,372kWh/kWp solar yield at the capital (PVGIS)
Portugal has 14 colocation facilities listed in PeeringDB. The TYNDP 2030 starting grid gives it about 4,200 MW of cross-border transmission capacity. Its climate averaged 231 cooling degree days a year (Eurostat), a rough guide to how hard data center cooling has to work.