In 2025, Czechia generated 75.5 TWh of electricity and used 68.0 TWh. Nuclear was the largest source at 42% of generation.
401gCO₂/kWh grid intensity#27 of 30 · EU 210
59%low-carbon electricityEU 71%
0.154€/kWh industrial, 2026 H1#21 cheapest · EU 0.135
144€m/yr power for 100 MW AI campus352 kt CO₂/yr
Grid access outlook (editorial)More room
Central location, nuclear baseload
59% of its electricity came from low-carbon sources (nuclear and renewables), below the EU-27 average of 71%. Grid carbon intensity was 401 gCO₂/kWh, ranking #27 of 30 European countries (1 = cleanest), down 27% since 2015. Industrial users consuming 20–70 GWh a year paid €0.154/kWhexcluding VAT in 2026 H1, more than the EU-27 average of €0.135 (#21 cheapest of 28). At €0.165/kWh, a 100 MWAI data center running at full load (876 GWh a year) would pay about €144 million a year for electricity and, on the average grid mix, be responsible for about 352 kt of CO₂.
Electricity generation mix, 2025
Source
Czechia
EU-27
Nuclear
42.3%
23.3%
Hydro
2.3%
11.7%
Wind
0.8%
17.1%
Solar
5.8%
13.1%
Bio & other renewables
8.0%
5.8%
Gas
5.4%
16.7%
Coal
35.2%
9.2%
Oil
0.2%
3.1%
Grid carbon intensity, 2005–2025
gCO₂ per kWh of electricity generated. Lower is cleaner.
Wind and solar share of generation
Industrial electricity price, 2019–2026 H1
Non-household consumers using 20–70 GWh/yr, excluding VAT and recoverable taxes, €/kWh.
Infrastructure & market
33colocation facilities (PeeringDB)
60data centers mapped in OpenStreetMap
–HV substations (pending)
6,700MW cross-border capacity, 2030 grid (TYNDP)
128€/MWh avg wholesale price, last 12 months
280hours with negative prices, last 12 months
24cooling degree days (5-yr avg)
916kWh/kWp solar yield at the capital (PVGIS)
Czechia has 33 colocation facilities listed in PeeringDB, and hosts 1 EuroHPC AI Factory (Czech AI Factory (CZAI)). Over the last 12 months the average day-ahead wholesale price was €128/MWh, with 280 hours of negative prices. The TYNDP 2030 starting grid gives it about 6,700 MW of cross-border transmission capacity. Its climate averaged 24 cooling degree days a year (Eurostat), a rough guide to how hard data center cooling has to work.