In 2025, Belgium generated 72.9 TWh of electricity and used 86.6 TWh. Nuclear was the largest source at 33% of generation.
150gCO₂/kWh grid intensity#13 of 30 · EU 210
72%low-carbon electricityEU 71%
0.133€/kWh industrial, 2026 H1#15 cheapest · EU 0.135
101€m/yr power for 100 MW AI campus131 kt CO₂/yr
Grid access outlook (editorial)Tight
Strong grid, growing demand
72% of its electricity came from low-carbon sources (nuclear and renewables), above the EU-27 average of 71%. Grid carbon intensity was 150 gCO₂/kWh, ranking #13 of 30 European countries (1 = cleanest), down 30% since 2015. Industrial users consuming 20–70 GWh a year paid €0.133/kWhexcluding VAT in 2026 H1, less than the EU-27 average of €0.135 (#15 cheapest of 28). At €0.115/kWh, a 100 MWAI data center running at full load (876 GWh a year) would pay about €101 million a year for electricity and, on the average grid mix, be responsible for about 131 kt of CO₂.
Electricity generation mix, 2025
Source
Belgium
EU-27
Nuclear
33.1%
23.3%
Hydro
0.6%
11.7%
Wind
18.8%
17.1%
Solar
14.3%
13.1%
Bio & other renewables
5.2%
5.8%
Gas
21.5%
16.7%
Coal
0.0%
9.2%
Oil
6.4%
3.1%
Grid carbon intensity, 2005–2025
gCO₂ per kWh of electricity generated. Lower is cleaner.
Wind and solar share of generation
Industrial electricity price, 2019–2026 H1
Non-household consumers using 20–70 GWh/yr, excluding VAT and recoverable taxes, €/kWh.
Infrastructure & market
42colocation facilities (PeeringDB)
89data centers mapped in OpenStreetMap
58high-voltage substations ≥220 kV (OSM)
10,380MW cross-border capacity, 2030 grid (TYNDP)
117€/MWh avg wholesale price, last 12 months
312hours with negative prices, last 12 months
16cooling degree days (5-yr avg)
872kWh/kWp solar yield at the capital (PVGIS)
Belgium has 42 colocation facilities listed in PeeringDB. Over the last 12 months the average day-ahead wholesale price was €117/MWh, with 312 hours of negative prices. The TYNDP 2030 starting grid gives it about 10,380 MW of cross-border transmission capacity. Its climate averaged 16 cooling degree days a year (Eurostat), a rough guide to how hard data center cooling has to work.