Eurodatum / Countries / Latvia
Country power profile · LV

Latvia: electricity for AI data centers

In 2025, Latvia generated 6.3 TWh of electricity and used 7.5 TWh. Hydro was the largest source at 47% of generation.

139gCO₂/kWh grid intensity#12 of 30 · EU 210
73%low-carbon electricityEU 71%
0.110€/kWh industrial, 2026 H1#9 cheapest · EU 0.135
93€m/yr power for 100 MW AI campus122 kt CO₂/yr

73% of its electricity came from low-carbon sources (nuclear and renewables), above the EU-27 average of 71%. Grid carbon intensity was 139 gCO₂/kWh, ranking #12 of 30 European countries (1 = cleanest), down 37% since 2015. Industrial users consuming 20–70 GWh a year paid €0.110/kWh excluding VAT in 2026 H1, less than the EU-27 average of €0.135 (#9 cheapest of 28). At €0.107/kWh, a 100 MW AI data center running at full load (876 GWh a year) would pay about €93 million a year for electricity and, on the average grid mix, be responsible for about 122 kt of CO₂.

Electricity generation mix, 2025

Hydro: 46.7%Wind: 3.5%Solar: 13.1%Bio & other renewables: 9.7%Gas: 26.2%Oil: 0.8%
SourceLatviaEU-27
Nuclear0.0%23.3%
Hydro46.7%11.7%
Wind3.5%17.1%
Solar13.1%13.1%
Bio & other renewables9.7%5.8%
Gas26.2%16.7%
Coal0.0%9.2%
Oil0.8%3.1%

Grid carbon intensity, 2005–2025

gCO₂ per kWh of electricity generated. Lower is cleaner.

0100200200520082011201420172020202320252005: 130 g2006: 172 g2007: 164 g2008: 158 g2009: 147 g2010: 179 g2011: 197 g2012: 146 g2013: 187 g2014: 202 g2015: 220 g2016: 204 g2017: 141 g2018: 216 g2019: 224 g2020: 177 g2021: 176 g2022: 135 g2023: 119 g2024: 134 g2025: 139 g139 g

Wind and solar share of generation

01020200520082011201420172020202320252005: 1%2006: 1%2007: 1%2008: 1%2009: 1%2010: 1%2011: 1%2012: 2%2013: 2%2014: 3%2015: 3%2016: 2%2017: 2%2018: 2%2019: 2%2020: 3%2021: 3%2022: 5%2023: 8%2024: 13%2025: 17%17%

Industrial electricity price, 2019–2026 H1

Non-household consumers using 20–70 GWh/yr, excluding VAT and recoverable taxes, €/kWh.

0.000.100.200.302019 H12020 H12021 H12022 H12023 H12024 H12025 H12026 H12019 H1: 0.0792019 H2: 0.0802020 H1: 0.0762020 H2: 0.0762021 H1: 0.0732021 H2: 0.1062022 H1: 0.1372022 H2: 0.2812023 H1: 0.1902023 H2: 0.1802024 H1: 0.1112024 H2: 0.1062025 H1: 0.1022025 H2: 0.1022026 H1: 0.1100.110

Infrastructure & market

11colocation facilities (PeeringDB)
6data centers mapped in OpenStreetMap
–HV substations (pending)
1,900MW cross-border capacity, 2030 grid (TYNDP)
–wholesale price (no single zone)
–negative-price hours
13cooling degree days (5-yr avg)
800kWh/kWp solar yield at the capital (PVGIS)

Latvia has 11 colocation facilities listed in PeeringDB. The TYNDP 2030 starting grid gives it about 1,900 MW of cross-border transmission capacity. Its climate averaged 13 cooling degree days a year (Eurostat), a rough guide to how hard data center cooling has to work.

See Latvia on the infrastructure map →

Power plant capacity by fuel

MW, plants in the WRI Global Power Plant Database (v1.3, data around 2021). Shows the long-standing fleet, not the latest additions.

HydroHydro: 1,536 MW1,536 MWGasGas: 1,001 MW1,001 MW

Official grid operator & sources: ENTSO-E · ENTSO-E Transparency Platform

Sources: Our World in Data energy dataset (Ember, Energy Institute), 2025; Eurostat nrg_pc_205, non-household prices excl. VAT, 2026 H1.