Europe runs at 50 Hz · data 2025

Europe's AI runs on grid power.

Data and plain-English definitions for Europe's AI infrastructure: what electricity costs, how clean it is and which grids still have room, for 30 countries.

210gCO₂/kWh, EU-27 grid 2025
71%low-carbon power, EU-27 2025
0.135€/kWh industrial, EU-27 2026 H1
2,775TWh electricity demand, EU-27 2025
AI Power Index 2025

Cheap and clean.

Every country plotted by what large users pay for power and how much CO₂ each kWh carries. The best places for AI compute sit bottom-left.

Consumption band:Cheaper & cleaner than median
0200400600Grid carbon intensity 2025, gCO₂/kWh€0.08€0.10€0.12€0.14€0.16€0.18€0.20€0.22Industrial electricity price, 2–20 GWh/yr, €/kWh excl. VAT€0.07€0.09€0.11€0.13€0.15€0.17€0.19€0.21Industrial electricity price, 20–70 GWh/yr, €/kWh excl. VAT€0.07€0.09€0.11€0.13€0.15€0.17Industrial electricity price, 70–150 GWh/yr, €/kWh excl. VATEU-27AustriaBelgiumBulgariaCroatiaCyprusCzechiaDenmarkEstoniaFinlandFranceGermanyGreeceHungaryIrelandItalyLatviaLithuaniaLuxembourgMaltaNetherlandsNorwayPolandPortugalRomaniaSlovakiaSloveniaSpainSweden
Why power is the bottleneck
€62–190m

What a single 100 MW AI campus would pay for a year of electricity in Europe at 2026 H1 industrial prices: from Norway to Cyprus. Same servers, very different bill.

Compare all countries →
Generation mix 2025

Where the power comes from.

Share of each source in electricity generation, sorted by low-carbon share.

NorwayNorway – Hydro: 90.0%Norway – Wind: 8.4%Norway – Solar: 0.3%Norway – Bio & other renewables: 0.2%Norway – Gas: 0.6%Norway – Oil: 0.4%99%SwedenSweden – Nuclear: 27.6%Sweden – Hydro: 40.0%Sweden – Wind: 22.8%Sweden – Solar: 2.6%Sweden – Bio & other renewables: 5.8%Sweden – Gas: 0.1%Sweden – Oil: 1.2%99%SwitzerlandSwitzerland – Nuclear: 29.9%Switzerland – Hydro: 52.3%Switzerland – Wind: 0.2%Switzerland – Solar: 12.1%Switzerland – Bio & other renewables: 3.2%Switzerland – Gas: 0.4%Switzerland – Oil: 1.9%98%FinlandFinland – Nuclear: 39.9%Finland – Hydro: 15.1%Finland – Wind: 27.4%Finland – Solar: 1.2%Finland – Bio & other renewables: 12.7%Finland – Gas: 1.2%Finland – Coal: 0.2%Finland – Oil: 2.3%96%FranceFrance – Nuclear: 68.8%France – Hydro: 10.4%France – Wind: 8.2%France – Solar: 5.6%France – Bio & other renewables: 1.9%France – Gas: 3.0%France – Coal: 0.3%France – Oil: 1.8%95%LuxembourgLuxembourg – Hydro: 3.2%Luxembourg – Wind: 30.5%Luxembourg – Solar: 30.5%Luxembourg – Bio & other renewables: 27.3%Luxembourg – Gas: 3.9%Luxembourg – Oil: 4.5%92%DenmarkDenmark – Hydro: 0.1%Denmark – Wind: 57.7%Denmark – Solar: 13.4%Denmark – Bio & other renewables: 20.1%Denmark – Gas: 2.4%Denmark – Coal: 2.7%Denmark – Oil: 3.7%91%SlovakiaSlovakia – Nuclear: 66.4%Slovakia – Hydro: 10.9%Slovakia – Solar: 2.4%Slovakia – Bio & other renewables: 5.5%Slovakia – Gas: 11.3%Slovakia – Coal: 1.1%Slovakia – Oil: 2.5%85%AustriaAustria – Hydro: 51.8%Austria – Wind: 11.3%Austria – Solar: 14.1%Austria – Bio & other renewables: 6.4%Austria – Gas: 11.9%Austria – Oil: 4.5%84%PortugalPortugal – Hydro: 29.7%Portugal – Wind: 26.7%Portugal – Solar: 17.3%Portugal – Bio & other renewables: 7.2%Portugal – Gas: 16.4%Portugal – Oil: 2.6%81%SloveniaSlovenia – Nuclear: 39.3%Slovenia – Hydro: 27.2%Slovenia – Wind: 0.1%Slovenia – Solar: 10.4%Slovenia – Bio & other renewables: 2.0%Slovenia – Gas: 6.4%Slovenia – Coal: 14.7%79%LithuaniaLithuania – Hydro: 3.9%Lithuania – Wind: 44.9%Lithuania – Solar: 18.8%Lithuania – Bio & other renewables: 10.0%Lithuania – Gas: 16.5%Lithuania – Oil: 5.8%78%CroatiaCroatia – Hydro: 39.3%Croatia – Wind: 21.4%Croatia – Solar: 8.8%Croatia – Bio & other renewables: 6.8%Croatia – Gas: 18.8%Croatia – Coal: 5.0%76%HungaryHungary – Nuclear: 40.0%Hungary – Hydro: 0.6%Hungary – Wind: 1.5%Hungary – Solar: 27.3%Hungary – Bio & other renewables: 6.0%Hungary – Gas: 20.3%Hungary – Coal: 3.4%Hungary – Oil: 1.0%75%SpainSpain – Nuclear: 18.8%Spain – Hydro: 11.4%Spain – Wind: 20.4%Spain – Solar: 21.8%Spain – Bio & other renewables: 2.2%Spain – Gas: 21.6%Spain – Coal: 0.3%Spain – Oil: 3.5%75%
NuclearHydroWindSolarBio & other renewablesGasCoalOil
Glossary

The grid, defined.

36 terms across grid connection, power markets, data center engineering, generation and EU policy.

24/7 carbon-free energy (CFE)24/7 CFE means matching every hour of electricity use with carbon-free generation on the same grid, not just matching annual totals.AI data centerAn AI data center is a facility designed for training and running AI models, with dense GPU or accelerator clusters, high power per rack and usually liquid cooling.AI Factories and AI Gigafactories (EU)AI Factories and AI Gigafactories are EU initiatives to build large shared AI computing facilities in Europe, linked to the EuroHPC supercomputing programme.Backup generatorsBackup generators, usually diesel or HVO-fuelled, provide emergency power to a data center if the grid fails.Baseload powerBaseload power is electricity supplied continuously around the clock, the kind of demand profile AI data centers have.Battery Energy Storage System (BESS)A BESS is a large battery installation that stores electricity and releases it when needed.Behind-the-meter generationBehind-the-meter generation is power produced on the user's side of the grid meter, for example on-site gas turbines, solar or fuel cells.Bidding zoneA bidding zone is an area of the European power market with a single wholesale electricity price.ColocationColocation is a data center model where an operator provides space, power and cooling and customers bring their own servers.CurtailmentCurtailment is when wind or solar output is deliberately reduced because the grid cannot absorb or transport it.Day-ahead marketThe day-ahead market is the auction where electricity for each hour (or 15 minutes) of the next day is bought and sold across coupled European markets.Demand responseDemand response is when an electricity user cuts or shifts consumption in response to grid signals or prices.Distribution System Operator (DSO)A DSO operates the medium- and low-voltage local grid that delivers power from transmission substations to homes, businesses and smaller data centers.Energy Efficiency Directive (EED) data center reportingThe recast EU Energy Efficiency Directive requires data centers above a size threshold (500 kW IT power demand) to report energy and sustainability data to an EU database.ENTSO-EENTSO-E is the European Network of Transmission System Operators for Electricity, the association that coordinates Europe's TSOs, grid planning and cross-border network codes.EU AI Act (energy aspects)The EU AI Act is the EU regulation on artificial intelligence; it includes documentation duties on energy consumption for providers of general-purpose AI models.FLAP-DFLAP-D is industry shorthand for Europe's five largest data center markets: Frankfurt, London, Amsterdam, Paris and Dublin.Flexible (non-firm) connectionA flexible connection is a grid agreement where a user gets power sooner in exchange for accepting limits or interruptions when the grid is stressed.Grid congestionGrid congestion happens when the network cannot carry all the power that users want to send or take at a given place and time.Grid connection queueA grid connection queue is the waiting list of projects that have applied to a grid operator for a new or bigger connection.Guarantees of Origin (GO)A Guarantee of Origin is an EU certificate proving that one megawatt-hour of electricity was produced from a specific, usually renewable, source.Hosting capacityHosting capacity is how much extra load or generation can be connected at a point in the grid without network upgrades.HyperscalerA hyperscaler is a very large cloud provider that builds and operates its own massive data centers, such as AWS, Microsoft Azure and Google Cloud.InterconnectorAn interconnector is a transmission line or cable linking the power grids of two countries or bidding zones.IT load vs facility loadIT load is the power consumed by servers, storage and networking; facility load adds cooling, power conversion losses and lighting.kW, MW, GW and MWh, TWhWatts (kW, MW, GW) measure power at a moment; watt-hours (kWh, MWh, TWh) measure energy used over time.Liquid coolingLiquid cooling removes heat from chips using water or other fluids instead of air, either through cold plates on the chip or by immersing servers.Network codes (grid codes)Network codes are the binding technical rules that every generator and large consumer must meet to connect to the European power grid.Power Purchase Agreement (PPA)A PPA is a long-term contract to buy electricity, often from a specific wind or solar farm, at an agreed price.Power Usage Effectiveness (PUE)PUE is total data center energy divided by the energy used by the IT equipment; 1.0 would mean zero overhead.Rack power densityRack power density is the electrical power drawn by one server rack, measured in kilowatts (kW) per rack.Small Modular Reactor (SMR)An SMR is a smaller nuclear reactor, typically under about 300 MW, designed to be factory-built and deployed in modules.SubstationA substation is a grid facility that transforms electricity between voltage levels and switches it between lines.Transmission System Operator (TSO)A TSO is the company that runs a country's high-voltage electricity transmission network and decides when large new users such as data centers can connect.Uninterruptible Power Supply (UPS)A UPS is the battery-based system that keeps servers running without interruption during the seconds between a grid failure and generator start-up.Waste heat reuseWaste heat reuse means capturing the heat that data centers produce and using it, most often in district heating networks.
FAQ

Quick answers.

Why is grid power the bottleneck for AI in Europe?

AI data centers need tens to hundreds of megawatts each, running around the clock. In many European hubs the transmission grid has no spare capacity, so new projects wait years for a connection.

Which European regions have the most room for new AI data centers?

Regions with spare capacity and low-carbon baseload, such as the Nordics, France and parts of Central Europe, are generally easier than congested FLAP-D hubs like Dublin, Amsterdam and Frankfurt. Always confirm with the local grid operator.

How much electricity does an AI data center use?

A 100 MW facility running at full load all year uses about 876 GWh. That is roughly what 200,000 average European households use in a year.

Is Eurodatum an official EU website?

No. Eurodatum is an independent reference. Check figures with ENTSO-E, the grid operators and official EU sources before making decisions.