In 2025, Slovakia generated 29.1 TWh of electricity and used 26.8 TWh. Nuclear was the largest source at 66% of generation.
95gCO₂/kWh grid intensity#6 of 30 · EU 210
85%low-carbon electricityEU 71%
0.171€/kWh industrial, 2026 H1#24 cheapest · EU 0.135
133€m/yr power for 100 MW AI campus83 kt CO₂/yr
Grid access outlook (editorial)More room
Low-carbon nuclear & hydro grid
85% of its electricity came from low-carbon sources (nuclear and renewables), above the EU-27 average of 71%. Grid carbon intensity was 95 gCO₂/kWh, ranking #6 of 30 European countries (1 = cleanest), down 47% since 2015. Industrial users consuming 20–70 GWh a year paid €0.171/kWhexcluding VAT in 2026 H1, more than the EU-27 average of €0.135 (#24 cheapest of 28). At €0.151/kWh, a 100 MWAI data center running at full load (876 GWh a year) would pay about €133 million a year for electricity and, on the average grid mix, be responsible for about 83 kt of CO₂.
Electricity generation mix, 2025
Source
Slovakia
EU-27
Nuclear
66.4%
23.3%
Hydro
10.9%
11.7%
Wind
0.0%
17.1%
Solar
2.4%
13.1%
Bio & other renewables
5.5%
5.8%
Gas
11.3%
16.7%
Coal
1.1%
9.2%
Oil
2.5%
3.1%
Grid carbon intensity, 2005–2025
gCO₂ per kWh of electricity generated. Lower is cleaner.
Wind and solar share of generation
Industrial electricity price, 2019–2026 H1
Non-household consumers using 20–70 GWh/yr, excluding VAT and recoverable taxes, €/kWh.
Infrastructure & market
6colocation facilities (PeeringDB)
4data centers mapped in OpenStreetMap
–HV substations (pending)
5,912MW cross-border capacity, 2030 grid (TYNDP)
–wholesale price (no single zone)
–negative-price hours
65cooling degree days (5-yr avg)
1,011kWh/kWp solar yield at the capital (PVGIS)
Slovakia has 6 colocation facilities listed in PeeringDB. The TYNDP 2030 starting grid gives it about 5,912 MW of cross-border transmission capacity. Its climate averaged 65 cooling degree days a year (Eurostat), a rough guide to how hard data center cooling has to work.