 "attribution": {
  "license": "CC BY 4.0",
  "license_url": "https://creativecommons.org/licenses/by/4.0/",
  "cite_as": "Eurodatum (https://eurodatum.com/#glossary), data: Our World in Data/Ember, Eurostat, November 2026",
  "required": "Credit 'Eurodatum' with a link to the page_url when quoting numbers, charts or definitions.",
  "page_url": "https://eurodatum.com/#glossary",
  "publisher": "Eurodatum by Cynsta Technologies s.r.o.",
  "publisher_url": "https://www.cynsta.com",
  "home": "https://eurodatum.com/"
 },
 "terms": [
  {
   "slug": "tso",
   "term": "Transmission System Operator (TSO)",
   "category": "Grid & connection",
   "definition": "A TSO is the company that runs a country's high-voltage electricity transmission network and decides when large new users such as data centers can connect.",
   "explanation": "Large AI data centers (tens to hundreds of megawatts) usually connect at transmission level, so the TSO is the gatekeeper for their power. Examples: EirGrid (Ireland), TenneT (Netherlands and part of Germany), Amprion, 50Hertz and TransnetBW (Germany), RTE (France), Elia (Belgium), Statnett (Norway), Svenska kraftnät (Sweden), Fingrid (Finland), Energinet (Denmark), PSE (Poland), ČEPS (Czechia) and SEPS (Slovakia).",
   "url": "https://eurodatum.com/term/tso/"
  },
  {
   "slug": "dso",
   "term": "Distribution System Operator (DSO)",
   "category": "Grid & connection",
   "definition": "A DSO operates the medium- and low-voltage local grid that delivers power from transmission substations to homes, businesses and smaller data centers.",
   "explanation": "Edge and enterprise data centers of a few megawatts typically connect to the DSO rather than the TSO. In congested regions, DSO capacity is often the first bottleneck.",
   "url": "https://eurodatum.com/term/dso/"
  },
  {
   "slug": "entso-e",
   "term": "ENTSO-E",
   "category": "Grid & connection",
   "definition": "ENTSO-E is the European Network of Transmission System Operators for Electricity, the association that coordinates Europe's TSOs, grid planning and cross-border network codes.",
   "explanation": "ENTSO-E publishes the Ten-Year Network Development Plan (TYNDP), adequacy studies and the Transparency Platform with load, generation and cross-border flow data, which are key sources for anyone siting AI infrastructure in Europe.",
   "url": "https://eurodatum.com/term/entso-e/"
  },
  {
   "slug": "network-codes",
   "term": "Network codes (grid codes)",
   "category": "Grid & connection",
   "definition": "Network codes are the binding technical rules that every generator and large consumer must meet to connect to the European power grid.",
   "explanation": "EU network codes cover connection requirements, system operation and market rules. Large data centers must meet demand-connection requirements, for example how they behave during frequency or voltage disturbances.",
   "url": "https://eurodatum.com/term/network-codes/"
  },
  {
   "slug": "grid-connection-queue",
   "term": "Grid connection queue",
   "category": "Grid & connection",
   "definition": "A grid connection queue is the waiting list of projects that have applied to a grid operator for a new or bigger connection.",
   "explanation": "In many European regions, data center requests now take years to be granted. Operators are reforming queues to move from 'first come, first served' toward prioritising projects that are ready to build.",
   "url": "https://eurodatum.com/term/grid-connection-queue/"
  },
  {
   "slug": "grid-congestion",
   "term": "Grid congestion",
   "category": "Grid & connection",
   "definition": "Grid congestion happens when the network cannot carry all the power that users want to send or take at a given place and time.",
   "explanation": "Congestion is the main reason new AI data centers in hubs such as Amsterdam, Dublin and Frankfurt face connection delays. Some operators publish congestion or capacity maps.",
   "url": "https://eurodatum.com/term/grid-congestion/"
  },
  {
   "slug": "hosting-capacity",
   "term": "Hosting capacity",
   "category": "Grid & connection",
   "definition": "Hosting capacity is how much extra load or generation can be connected at a point in the grid without network upgrades.",
   "explanation": "Checking hosting capacity maps is one of the first steps in data center site selection, because sites with spare capacity can connect much faster.",
   "url": "https://eurodatum.com/term/hosting-capacity/"
  },
  {
   "slug": "flexible-connection",
   "term": "Flexible (non-firm) connection",
   "category": "Grid & connection",
   "definition": "A flexible connection is a grid agreement where a user gets power sooner in exchange for accepting limits or interruptions when the grid is stressed.",
   "explanation": "For data centers this usually means on-site batteries or generation to ride through limited periods, in return for a faster connection date.",
   "url": "https://eurodatum.com/term/flexible-connection/"
  },
  {
   "slug": "substation",
   "term": "Substation",
   "category": "Grid & connection",
   "definition": "A substation is a grid facility that transforms electricity between voltage levels and switches it between lines.",
   "explanation": "Large data center campuses often need their own dedicated high-voltage substation, which can be one of the longest-lead items in the project.",
   "url": "https://eurodatum.com/term/substation/"
  },
  {
   "slug": "interconnector",
   "term": "Interconnector",
   "category": "Grid & connection",
   "definition": "An interconnector is a transmission line or cable linking the power grids of two countries or bidding zones.",
   "explanation": "Interconnectors let regions with surplus power, such as the hydro-rich Nordics, export to demand centers, and they influence where power is cheapest for AI workloads.",
   "url": "https://eurodatum.com/term/interconnector/"
  },
  {
   "slug": "curtailment",
   "term": "Curtailment",
   "category": "Grid & connection",
   "definition": "Curtailment is when wind or solar output is deliberately reduced because the grid cannot absorb or transport it.",
   "explanation": "Regions with frequent curtailment have cheap surplus renewable power, which makes them attractive for flexible AI training workloads.",
   "url": "https://eurodatum.com/term/curtailment/"
  },
  {
   "slug": "bidding-zone",
   "term": "Bidding zone",
   "category": "Power markets & contracts",
   "definition": "A bidding zone is an area of the European power market with a single wholesale electricity price.",
   "explanation": "Most countries are one zone, but some are split, for example Norway, Sweden, Italy and Denmark. Prices between zones can differ a lot, which matters for data center power costs.",
   "url": "https://eurodatum.com/term/bidding-zone/"
  },
  {
   "slug": "day-ahead-market",
   "term": "Day-ahead market",
   "category": "Power markets & contracts",
   "definition": "The day-ahead market is the auction where electricity for each hour (or 15 minutes) of the next day is bought and sold across coupled European markets.",
   "explanation": "Day-ahead prices are the reference for most power contracts. Flexible AI workloads can be scheduled toward cheaper hours.",
   "url": "https://eurodatum.com/term/day-ahead-market/"
  },
  {
   "slug": "ppa",
   "term": "Power Purchase Agreement (PPA)",
   "category": "Power markets & contracts",
   "definition": "A PPA is a long-term contract to buy electricity, often from a specific wind or solar farm, at an agreed price.",
   "explanation": "Tech companies are among the largest buyers of corporate PPAs in Europe and use them to secure price stability and renewable supply for data centers.",
   "url": "https://eurodatum.com/term/ppa/"
  },
  {
   "slug": "guarantees-of-origin",
   "term": "Guarantees of Origin (GO)",
   "category": "Power markets & contracts",
   "definition": "A Guarantee of Origin is an EU certificate proving that one megawatt-hour of electricity was produced from a specific, usually renewable, source.",
   "explanation": "GOs are used to claim renewable electricity use. Critics note that annual GO matching does not mean the data center actually ran on clean power every hour.",
   "url": "https://eurodatum.com/term/guarantees-of-origin/"
  },
  {
   "slug": "cfe-24-7",
   "term": "24/7 carbon-free energy (CFE)",
   "category": "Power markets & contracts",
   "definition": "24/7 CFE means matching every hour of electricity use with carbon-free generation on the same grid, not just matching annual totals.",
   "explanation": "It is a stricter standard than annual renewable matching and favours locations with diverse clean supply such as hydro, nuclear, wind and storage.",
   "url": "https://eurodatum.com/term/cfe-24-7/"
  },
  {
   "slug": "demand-response",
   "term": "Demand response",
   "category": "Power markets & contracts",
   "definition": "Demand response is when an electricity user cuts or shifts consumption in response to grid signals or prices.",
   "explanation": "Data centers can provide demand response by shifting batch AI training, running on batteries, or using backup generation, and can be paid for it.",
   "url": "https://eurodatum.com/term/demand-response/"
  },
  {
   "slug": "baseload",
   "term": "Baseload power",
   "category": "Generation & storage",
   "definition": "Baseload power is electricity supplied continuously around the clock, the kind of demand profile AI data centers have.",
   "explanation": "Data centers run close to 24/7, which is why operators look for steady supply such as nuclear, hydro, firmed renewables or long-term contracts.",
   "url": "https://eurodatum.com/term/baseload/"
  },
  {
   "slug": "smr",
   "term": "Small Modular Reactor (SMR)",
   "category": "Generation & storage",
   "definition": "An SMR is a smaller nuclear reactor, typically under about 300 MW, designed to be factory-built and deployed in modules.",
   "explanation": "SMRs are discussed as future dedicated power for data center campuses, but most European projects are still in planning or licensing.",
   "url": "https://eurodatum.com/term/smr/"
  },
  {
   "slug": "bess",
   "term": "Battery Energy Storage System (BESS)",
   "category": "Generation & storage",
   "definition": "A BESS is a large battery installation that stores electricity and releases it when needed.",
   "explanation": "Data centers use batteries for backup, peak shaving and grid services, and to qualify for flexible grid connections.",
   "url": "https://eurodatum.com/term/bess/"
  },
  {
   "slug": "behind-the-meter",
   "term": "Behind-the-meter generation",
   "category": "Generation & storage",
   "definition": "Behind-the-meter generation is power produced on the user's side of the grid meter, for example on-site gas turbines, solar or fuel cells.",
   "explanation": "Some AI campuses add on-site generation to start operating before a full grid connection is available.",
   "url": "https://eurodatum.com/term/behind-the-meter/"
  },
  {
   "slug": "backup-generators",
   "term": "Backup generators",
   "category": "Generation & storage",
   "definition": "Backup generators, usually diesel or HVO-fuelled, provide emergency power to a data center if the grid fails.",
   "explanation": "They are sized to carry the full critical load and are tested regularly. Permits for large generator fleets are increasingly scrutinised for emissions.",
   "url": "https://eurodatum.com/term/backup-generators/"
  },
  {
   "slug": "ups",
   "term": "Uninterruptible Power Supply (UPS)",
   "category": "Data center engineering",
   "definition": "A UPS is the battery-based system that keeps servers running without interruption during the seconds between a grid failure and generator start-up.",
   "explanation": "AI clusters with fast-changing power draw are pushing UPS and power electronics design to handle large load swings.",
   "url": "https://eurodatum.com/term/ups/"
  },
  {
   "slug": "pue",
   "term": "Power Usage Effectiveness (PUE)",
   "category": "Data center engineering",
   "definition": "PUE is total data center energy divided by the energy used by the IT equipment; 1.0 would mean zero overhead.",
   "explanation": "Modern efficient facilities report PUE around 1.1–1.3. Germany's Energy Efficiency Act sets PUE targets for new data centers.",
   "url": "https://eurodatum.com/term/pue/"
  },
  {
   "slug": "it-load",
   "term": "IT load vs facility load",
   "category": "Data center engineering",
   "definition": "IT load is the power consumed by servers, storage and networking; facility load adds cooling, power conversion losses and lighting.",
   "explanation": "Data center capacity is usually quoted in MW of IT load. Grid connection must cover facility load, which is higher.",
   "url": "https://eurodatum.com/term/it-load/"
  },
  {
   "slug": "rack-density",
   "term": "Rack power density",
   "category": "Data center engineering",
   "definition": "Rack power density is the electrical power drawn by one server rack, measured in kilowatts (kW) per rack.",
   "explanation": "Traditional racks drew roughly 5–15 kW. Modern AI GPU racks can need several tens of kW up to well over 100 kW, which requires liquid cooling and heavier power distribution.",
   "url": "https://eurodatum.com/term/rack-density/"
  },
  {
   "slug": "liquid-cooling",
   "term": "Liquid cooling",
   "category": "Data center engineering",
   "definition": "Liquid cooling removes heat from chips using water or other fluids instead of air, either through cold plates on the chip or by immersing servers.",
   "explanation": "It is becoming standard for high-density AI racks and makes it easier to reuse waste heat because the heat comes out at higher temperatures.",
   "url": "https://eurodatum.com/term/liquid-cooling/"
  },
  {
   "slug": "waste-heat-reuse",
   "term": "Waste heat reuse",
   "category": "Data center engineering",
   "definition": "Waste heat reuse means capturing the heat that data centers produce and using it, most often in district heating networks.",
   "explanation": "It is common in the Nordics and is encouraged or required in some EU countries, for example under Germany's Energy Efficiency Act.",
   "url": "https://eurodatum.com/term/waste-heat-reuse/"
  },
  {
   "slug": "hyperscaler",
   "term": "Hyperscaler",
   "category": "Data center engineering",
   "definition": "A hyperscaler is a very large cloud provider that builds and operates its own massive data centers, such as AWS, Microsoft Azure and Google Cloud.",
   "explanation": "Hyperscalers' AI expansion is the main driver of new data center power demand in Europe.",
   "url": "https://eurodatum.com/term/hyperscaler/"
  },
  {
   "slug": "colocation",
   "term": "Colocation",
   "category": "Data center engineering",
   "definition": "Colocation is a data center model where an operator provides space, power and cooling and customers bring their own servers.",
   "explanation": "Colocation hubs in Europe are concentrated in the FLAP-D markets: Frankfurt, London, Amsterdam, Paris and Dublin.",
   "url": "https://eurodatum.com/term/colocation/"
  },
  {
   "slug": "flap-d",
   "term": "FLAP-D",
   "category": "Data center engineering",
   "definition": "FLAP-D is industry shorthand for Europe's five largest data center markets: Frankfurt, London, Amsterdam, Paris and Dublin.",
   "explanation": "Grid constraints in FLAP-D cities are pushing new AI capacity toward secondary markets such as the Nordics, Spain, Italy and Central Europe.",
   "url": "https://eurodatum.com/term/flap-d/"
  },
  {
   "slug": "ai-data-center",
   "term": "AI data center",
   "category": "Data center engineering",
   "definition": "An AI data center is a facility designed for training and running AI models, with dense GPU or accelerator clusters, high power per rack and usually liquid cooling.",
   "explanation": "Compared with classic cloud data centers they need more power per square metre and often larger single grid connections.",
   "url": "https://eurodatum.com/term/ai-data-center/"
  },
  {
   "slug": "ai-gigafactory",
   "term": "AI Factories and AI Gigafactories (EU)",
   "category": "EU policy & regulation",
   "definition": "AI Factories and AI Gigafactories are EU initiatives to build large shared AI computing facilities in Europe, linked to the EuroHPC supercomputing programme.",
   "explanation": "In 2025 the EU announced the InvestAI initiative to mobilise funding including for AI gigafactories. Each gigafactory needs very large power supply, making grid access a central selection criterion.",
   "url": "https://eurodatum.com/term/ai-gigafactory/"
  },
  {
   "slug": "eed",
   "term": "Energy Efficiency Directive (EED) data center reporting",
   "category": "EU policy & regulation",
   "definition": "The recast EU Energy Efficiency Directive requires data centers above a size threshold (500 kW IT power demand) to report energy and sustainability data to an EU database.",
   "explanation": "Reported indicators include energy use, PUE, water use, waste heat reuse and renewable energy share. The data supports a future EU rating scheme for data centers.",
   "url": "https://eurodatum.com/term/eed/"
  },
  {
   "slug": "eu-ai-act",
   "term": "EU AI Act (energy aspects)",
   "category": "EU policy & regulation",
   "definition": "The EU AI Act is the EU regulation on artificial intelligence; it includes documentation duties on energy consumption for providers of general-purpose AI models.",
   "explanation": "Its energy transparency rules connect AI model development with the electricity use of the data centers that train them.",
   "url": "https://eurodatum.com/term/eu-ai-act/"
  },
  {
   "slug": "energy-units",
   "term": "kW, MW, GW and MWh, TWh",
   "category": "Grid & connection",
   "definition": "Watts (kW, MW, GW) measure power at a moment; watt-hours (kWh, MWh, TWh) measure energy used over time.",
   "explanation": "A 100 MW data center running all year at full load uses about 876 GWh (0.876 TWh) per year. Grid connections are sized in MW; energy bills are in MWh.",
   "url": "https://eurodatum.com/term/energy-units/"
  }
 ]
}